Pictures above show preparation of area for construction with materials being seen and dividing walls removed. Pictures below show simultaneous preparation for floor, wall and roofing area for extension.
Pictures above show continuation of floor works with measurements for tile works. Pictures below show removal of dividing walls, preparation and construction for the new office with meeting area, pantry and IT office with the additional comfort room.
Pictures above show continued works for measurements and area preparation. Pictures below show outside shot for construction and inside preparation with start of wall preparation with cementation.
Pictures above show simultaneous work for office extension with respective roofing extension for IT office. The whole of the IT/main office expanded quite well to include the meeting area, pantry, IT office and additional comfort room. Pictures below show continued work for wall preparation with cementation.
Pictures above show preparation for the whole office division to include IT office and pantry which has the additional comfort room. The space outside which is the main office space becomes the meeting area. Pictures below show wall division for IT office which shows back door/window pantry.
Left picture above shows inside of IT office showing back door which would have double lock for security purposes while window will have grills. Right picture shows inside of comfort roof wash area and toilet. Left picture below shows meeting area and far shot of the IT office and pantry which are side by side while right picture below shows closer shot of IT office and pantry entrance.
Left picture above shows entrance of the whole IT/Main office with the windows prepared for glass windows with first coating of white paint while right picture above shows meeting area upon entrance. Left picture below shows inside of comfort room while right picture below shows inside of pantry also with wash area.
Left picture above shows inside of pantry showing door of entrance (outside before entrance to the pantry is the meeting area) and door to comfort room while right picture above shows inside of meeting area showing windows prepared for glass windows. Left picture below is a far shot IT/Main office still under construction.