Project: Upgrading Solutions for PWDs this Pandemic
Proponent: Tahanang Walang Hagdanan, Inc.
Funded by: Direct Aid Program of the Australian Embassy in the Philippines
PICTORIAL DOCUMENTATION
Last Phase of Implementation
Picture above shows meeting area of IT office which is already being utilized as TWH headquarters where important transactions are made while picture below shows lobby area.
Pictures show usage of IT/Main office meeting area with the board meeting held last December 17, 2021, morning before TWH Christmas gathering. Pictures showing our President, EVP/COO, Board Secretary & Board Members.
Picture shows IT office set-up which is already operational.
Pictures show IT equipment – left side is the copier while right side is the scanner and below left is the network storage attached, both of which are placed on table. Said equipment are being utilized by IT office. Below right is the printer which is placed at the moment with the EVP COO because of important woodcraft project.
Simulation of marker placement with picture above showing IT office metal marker and picture below showing canteen marker. Presently, metal markers are being fabricated with delay for their fabrication. Their actual placement shall be done upon completion.